The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

Excerpt from the Wikipedia article “Critical path method”, under the CC BY-SA 4.0 license. Read the article on Wikipedia

Image: Pert_chart_colored.gif: Original uploader was Jeremykemp at en.wikipedia derivative work: Rehua (talk), Public domain, via Wikimedia Commons.

Open free boosters and add Critical path method to your collection.

Play for free

Related cards